The $1.2M Mistake: Why Owner’s Reps Must Be Engaged Early
A $1.2 million mistake taught David Gray a hard truth: waiting too long to hire an Owner’s Rep costs more than it saves. This post explains why early engagement pays off.

Scope Baseline Docs: Locking the Vision, Avoiding the Drift
Projects don’t usually fail all at once — they fail by drifting. In this post, David Gray explains why scope baseline docs are essential to anchor vision, control scope, and prevent drift.

Scope Management & Control: Protecting the Vision Before It Slips Away
Projects don’t usually fail from one big mistake—they fail in the margins, and scope is often the culprit. In this post, David Gray shares practical insights on how to define, protect, and control scope so capital projects stay aligned with strategy and deliver results that last.

Cost Control: Planning for Predictability
Budget overruns aren’t just common—they’re expected. But they don’t have to be. In this post, we explore how real cost control (not just tracking) can help capital project leaders forecast accurately, manage contingencies, and build confidence from boardroom to jobsite.